Delmon Complete Solutions

Project Management

VR Table

Safe and fast shifting system, saving time and money.

Slab formwork that is pre- assembled and moved around site by crane, thereby reducing labour, time and cost. Tables are ideally suited to medium and high rise construction and is a very fast and safe system.

 

Delmon---Fasttrack-Tables-MiniBENEFITS

  • Saves time on jobsite as large pre-assembled tables are moved by crane with dismantling.
  • Excellent solution to leading edge makes it a very safe system.
  • Faster and safer striking procedure.
  • Reduced labour requirement.
  • Reduced damage and less consumables used.
  • Excellent concrete finish achievable.
  • Very simple to use.
  • Very fast cycle times.

High efficiency for Slab ConstructionDelmon---VR-Tables-Structure

 

COMPONENTS

  1. Beam VM 20
  2.  Head VR
  3. Double Head VR
  4. Toeboard
  5. Handrail Post SV
  6. Tube
  7. Prop
  8. Trolley VR
  9. Hook VR
  10. Plywood

BASIC COMPONENTS

Timber Beam
ProductCodeKG
Timber Beam VM 20/2.45195012912.3
Timber Beam VM 20/2.9194014414.5
Timber Beam VM 20/3.3195013016.5
Timber Beam VM 20/3.6194014618
Timber Beam VM 20/3.9195011219.5
Timber Beam VM 20/4.5194017822.5
Timber Beam VM 20/4.9195011324.5
Timber Beam VM 20/5.9194014929.5
Delmon---Enkoform-Timber-Beam-VM
Head VR
ProductCodeKG
Head VR221101215.5
Head VR-SP/EP22117009.6
Swivel Head VR221108020.5
Delmon---VR-Table-Head-VR
Hook VR
ProductCodeKG
Hook VR2211030770
Hook VR 600/54022111501450
Delmon---VR-Table-Hook-VR
Trolley VR
ProductCodeKG
Trolley VR2211031431
Delmon---VR-Table-Trolley-VR

Subscribe To Our Newsletter to

Download Brochure

* indicates required

You have Successfully Subscribed!

Share This