Delmon Complete Solutions
Project Management
Safe and fast shifting system, saving time and money.
Slab formwork that is pre- assembled and moved around site by crane, thereby reducing labour, time and cost. Tables are ideally suited to medium and high rise construction and is a very fast and safe system.
BENEFITS
- Saves time on jobsite as large pre-assembled tables are moved by crane with dismantling.
- Excellent solution to leading edge makes it a very safe system.
- Faster and safer striking procedure.
- Reduced labour requirement.
- Reduced damage and less consumables used.
- Excellent concrete finish achievable.
- Very simple to use.
- Very fast cycle times.
High efficiency for Slab Construction
COMPONENTS
- Beam VM 20
- Head VR
- Double Head VR
- Toeboard
- Handrail Post SV
- Tube
- Prop
- Trolley VR
- Hook VR
- Plywood
BASIC COMPONENTS
Timber Beam
Product | Code | KG |
---|---|---|
Timber Beam VM 20/2.45 | 1950129 | 12.3 |
Timber Beam VM 20/2.9 | 1940144 | 14.5 |
Timber Beam VM 20/3.3 | 1950130 | 16.5 |
Timber Beam VM 20/3.6 | 1940146 | 18 |
Timber Beam VM 20/3.9 | 1950112 | 19.5 |
Timber Beam VM 20/4.5 | 1940178 | 22.5 |
Timber Beam VM 20/4.9 | 1950113 | 24.5 |
Timber Beam VM 20/5.9 | 1940149 | 29.5 |
Head VR
Product | Code | KG |
---|---|---|
Head VR | 2211012 | 15.5 |
Head VR-SP/EP | 2211700 | 9.6 |
Swivel Head VR | 2211080 | 20.5 |
Hook VR
Product | Code | KG |
---|---|---|
Hook VR | 2211030 | 770 |
Hook VR 600/540 | 2211150 | 1450 |
Trolley VR
Product | Code | KG |
---|---|---|
Trolley VR | 2211031 | 431 |